Project Title: HEC Submarine Gas Pipeline
   
Project Owner / Government Department: The Hongkong Electric Co Ltd
   
Location: Lamma Power Station to Guangdong Dapeng LNG Receiving Terminal located at Shenzhen
   
Consultant(s): - Kvaerner E&C Singapore Pte Ltd
- OGI Pte Ltd
   
Contractor(s): Saipem Asia Sdn Bhd
   
Commencement Date: February 2005
   
Completion Date: June 2006
   
Project Description: To facilitate transmission of natural gas to Lamma Extension from Guangdong Dapeng LNG Receiving Terminal located at Cheng Tou Jiao, Shenzhen for electricity generation, HEC has constructed a 92 kilometres Submarine Gas Pipeline. With a diameter of 20 inches, the steel pipeline is buried at 3 metres under the seabed and is protected by armour rock at strategic locations along the pipeline route. The pipeline is designed with a life of 50 years and has adequate capacity to supply extra gas to cope with future gas and electricity demand of Hong Kong.

Natural gas extracted from gas fields in Australia's North-West Shelf is liquefied and transported as liquefied natural gas (LNG) by ship to Guangdong LNG Terminal. At the terminal, the LNG is gasified and supplied to Lamma Island via the 92 kilometres submarine gas pipeline.
   
Project Award(s): /
   
Related Website:
The Hongkong Electric Co Ltd